Sitecore
XP to XM Cloud Phase 6: Cutover and Go-Live
This phase typically takes 2-4 weeks and covers the final cutover from XP to XM Cloud, including go-live and post-launch stabilization.
Pre-Cutover Checklist
Section titled “Pre-Cutover Checklist”- Final content sync — Export from XP, import to XM Cloud (one last time)
- DNS records prepared — CNAME to Vercel or rendering host
- SSL certificates configured — HTTPS enabled on rendering host
- Monitoring configured — Vercel Analytics, Sitecore Cloud SDK telemetry
- Rollback plan documented — DNS rollback to XP if catastrophic failure
Cutover Day
Section titled “Cutover Day”Timeline:
- Freeze XP content (6am) — Communicate to content editors, disable editing
- Final content sync (7am-9am) — Export from XP, import to XM Cloud, validate
- Switch DNS (10am) — Point domain to new rendering host
- Verify live site (10am-11am) — Smoke tests, critical path testing
- Monitor (11am-6pm) — Logs, errors, performance metrics
Post-Cutover
Section titled “Post-Cutover”- Week 1: Hypercare — Daily check-ins, immediate bug fixes, content editor support
- Week 2-4: Stabilization — Monitor performance, gather content editor feedback, address issues
- Month 2-3: Optimization — Performance tuning (ISR strategies, image optimization), content editor training
Rollback Strategy
Section titled “Rollback Strategy”If catastrophic failure occurs:
- DNS rollback — Switch DNS back to XP (fastest, 5-minute TTL)
- Content rollback — XP content still intact (no data loss)
- Communication — Notify stakeholders, set new cutover date
Risk Mitigation: Keep XP running in parallel for 2-4 weeks after cutover (safety net).